Depending on the job you need done, we have performed a number of different projects to illustrate just some of the potential we have for servicing your construction needs. With over 25 years of commercial and industrial experience, call us at (323) 295-5484 to discuss your construction project.
PROJECTS WE’VE WORKED ON
Renovate Hangar 6 Various Systems (Design Build)
Oak Harbor, Washington
Client: Department of the Navy
Made upgrades to the electrical service, replace electrical distribution panels, replace hot & cold water lines, install new water heaters, install new windows & replace entire roof of hangar. Project Data:
Work Performed:
• Scheduling • Value Engineering • Constructability Reviews • Cost Estimating • Design Build Construction Engineers • Testing Services • Quality Assurance and Inspection • Contract Document Review Contract Document Review • Document Control Services • Roofing • Electrical • HVAC & Plumbing • Abatement • Site Safety • Painting |
Repair Airfield Lighting Systems
Oak Harbor, Washington
Wells Fargo
Huntington Park, California
Client: Wells Fargo Bank, N.A.
In store build of new Wells Fargo Bank (Superior Market). Work consisted of demolition, installation of fire alarm system and fire sprinklers, electrical wiring and panel upgrade and installation, installation of telecommunication lines for teller stations, carpeting, acoustical ceilings, painting, drywall metal stud framing. Project Data: • Wells Fargo Bank, N.A. • Privately owned Work Performed:
• Drywall • Metal Stud Framing • Painting • Cost Estimating • Acoustical Ceilings • HVAC • Carpet Installation • Electrical • Testing • Fire Sprinklers • Telecommunications’ • Glass & Glazing • Demolition |
Flooring IDIQ Multiple Delivery Orders
Client: Department of the Air Force
Patrick Air Force Base, Florida
Work Performed:
• Demolition
• Tile Installation
• Carpet Installation
• Cost Estimating
• Site Work
• Quality Assurance and Inspection
Client: Department of the Air Force
Patrick Air Force Base, Florida
Work Performed:
• Demolition
• Tile Installation
• Carpet Installation
• Cost Estimating
• Site Work
• Quality Assurance and Inspection
Modernize Hangar 7 Fire Suppression System (Design Build)
Oak Harbor, Washington
Client: Department of the Navy
Repair airfield lighting system (Design Build). Replace runway centerline & simulated carrier deck lighting on both runways. Project Data: • NAVFAC-NW-FEC NW • Multiple Award Construction Contract Work Performed:
• Scheduling • Value Engineering • Construction Management • Mechanical • Cost Estimating • Quality Assurance and Inspection • Safety Management • Contract Document Review • Electrical • Fire Prevention Engineer • Fire Sprinkler Specialist • Geologic Drilling • Lead Abatement |
• Safety Management
• Contract Document Review • Electrical • Fire Prevention Engineer • Fire Sprinkler Specialist • Geologic Drilling • Lead Abatement |
Reagan Library
“The Suites” in Woodland Hills
“Flywheel"
"Coffee Bean” Woodland Hills
LAX Transit Corridor
Client: Select Electric Inc.
We Performed:
Concrete Saw Cutting
Client: Select Electric Inc.
We Performed:
Concrete Saw Cutting
Regional Connector Advanced Utility Relocation
Client: Pulice Construction
Work Performed: Concrete Slurry Backfill on this Metro project.
Client: Pulice Construction
Work Performed: Concrete Slurry Backfill on this Metro project.
LAX Transit Corridor
Blue Roofing Project
Client: Us Army Corps Of Engineers
Worked Performed:
Install Temporary Blue Trap for the homes
that were damaged during Hurricane Michael in Panama City, FL
We tarped over 5,000 roofing in 30 days.
Worked Performed:
Install Temporary Blue Trap for the homes
that were damaged during Hurricane Michael in Panama City, FL
We tarped over 5,000 roofing in 30 days.