top of page

13 items found for ""

  • Intuit Dome

    Subcontractor Project Address: 3939 W 102nd St Inglewood, CA 90303 Duration: 10/16/2023 - ongoing Work Performed: Seat Installation

  • Project Cypress - Disney

    Subcontractor Project Address: Disneyland Duration: 07/17/2023 - 11/01/2023 Worked Performed: Back of House Gypsum Board Assemblies

  • Southwest Yard

    Subcontractor Duration: September 2016 to September 2018 Work Performed: Formwork & Pads for all building foundations Platform isolation blockout Trench Drains​ Provide cutting block-outs for trackwork Provided rebar templates

  • Gerald Desmond Bridge

    Work Performed: Pending info

  • Wells Fargo, ​Huntington Park, California

    Client:  Wells Fargo Bank, N.A. In store build of new Wells Fargo Bank (Superior Market). Work consisted of demolition, installation of fire alarm system and fire sprinklers, electrical wiring and panel upgrade and installation, installation of telecommunication lines for teller stations, carpeting, acoustical ceilings, painting, drywall metal stud framing. Project Data: • Wells Fargo Bank, N.A. • Privately owned Work Performed : • Drywall • Metal Stud Framing • Painting • Cost Estimating • Acoustical Ceilings • HVAC • Carpet Installation • Electrical • Testing • Fire Sprinklers • Telecommunications’ • Glass & Glazing • Demolition

  • Reagan Library

    Client:​ Gilbane Building Company Work Performed: Site Concrete ADA Upgrades Asphalt Paving

  • "Coffee Bean” Woodland Hills

    Client: Pr Construction Inc. We performed: Acoustical Ceilings Insulation Drywall Metal Stud Framing

  • LAX Transit Corridor

    Client: Select Electric Inc.   We Performed: Concrete Saw Cutting

  • Regional Connector Advanced Utility Relocation

    Client: Pulice Construction Work Performed: Concrete Slurry Backfill on this Metro project

  • LAX Transit Corridor

    Client: Walsh-Shea Corrdor Construction Work performed : Carpet Installation Low Voltage Electrical Drywall Metal Stud Framing Acoustical Ceilings Doors, Frames & Hardware Cubicle Installation s Metro project

  • Blue Roofing Project

    Client: Us Army Corps Of Engineers Worked Performed: Install Temporary Blue Trap for the homes that were damaged during Hurricane Michael in Panama City, FL We tarped over 5,000 roofing in 30 days

  • South western Yard

    Client : Hensel Phelphs Work Performed: Formwork & Pads for all building foundations Platform isolation blockout Trench Drains Provide cutting blocks-outs for trackwork Provide rebar templates

SEARCH RESULTS

bottom of page